description: "RFI (Request for Inspection) lets the RFI Initiator request an inspection from mobile with proof. An admin turns RFI on per project: Settings → RFI → toggle on, set the RFI questions (project-wide, same for every checklist), adjust Witness/Drawings/Re-RFI (Re-RFI on by default), Save, Go live. Different projects can have different RFI."
url: https://help.digiqc.com/en/articles/158-2525-rfi-introduction-and-setup-for-the-project
collection: "2.5 Web Setup, Monitoring, Tracking and Analysis"
updated: 2026-11-05
language: en
---

# 2.5.25 RFI Introduction and setup for the Project

RFI (Request for Inspection) lets the RFI Initiator request an inspection from mobile with proof. An admin turns RFI on per project: Settings → RFI → toggle on, set the RFI questions (project-wide, same for every checklist), adjust Witness/Drawings/Re-RFI (Re-RFI on by default), Save, Go live. Different projects can have different RFI.

### Overview

**RFI (Request for Inspection)** lets the RFI Initiator **formally request an inspection** from the mobile app — with the **date, time, location and live photos** as proof that work is ready. It solves a common site problem: inspections called **too early** waste time, and **missed** inspections cause delays. With RFI the RFI Initiator signals exactly when work is ready, all requests and results are **centralised and trackable**, and communication stays clear. Before it can be used, an **admin turns RFI on for the project** and configures it on the web app.

### 🧭 How to use — set up RFI for a project

1.  Open the web app → **Projects** tab → **select the project.**
    
2.  Click **Settings** (top-right) → select **RFI.**
    
3.  Turn on the **RFI Setup** toggle.
    
4.  **Set the RFI points (questions):**
    

\- **Three standard questions** are provided by default. - **Use** them as is, **modify** them, or **add new** ones with **\+ Add.** - These **RFI questions and details apply to the whole project** — they are the **same for every checklist** and **can't be changed checklist-wise.** A **different project can have a different RFI setup.**

1.  **Adjust additional settings** (Settings tab) — enable/disable **Witness**, **Drawings**, and the **Re-RFI** button.
    

\- **Re-RFI is ON by default.** - **Re-RFI On** — if an inspection is **Failed or given Redo**, the RFI Initiator must raise a **fresh RFI (Re-RFI)** to restart the process. - **Re-RFI Off** — on a **Fail or Redo**, the process **starts again from the Checklist stage**; a **fresh RFI is not needed.**

1.  Click **Save.**
    
2.  Click **Go live** to activate RFI for the project.
    

### How RFI works once live (quick view)

-   **Raise RFI** — the RFI Initiator selects the location/component and requests inspection, with details and photos.
    
-   **Track** — the request is tracked in real time.
    
-   **Inspect & decide** — the Checker inspects, then **approves** or gives **Redo** with a comment.
    

_(Full flows in "2.6.12 All RFI workflows & related details".)_

### ❓ FAQ

#### 1\. What is RFI, and why use it?

**Request for Inspection** — a digital request the RFI Initiator **raises** when work is ready, with proof (date, time, location, photos). It ensures inspections happen at the **right time** — not too early, not missed — with clear tracking.

#### 2\. How do I turn RFI on for a project?

### Projects → select the project → Settings → RFI**, turn on** RFI Setup**, configure it,** Save**, then** Go live.

#### What are "RFI points"?

The **questions** on the RFI form — **three standard ones** by default; you can **modify** or **add** your own.

#### Can the RFI questions be different for each checklist?

No — the **RFI questions and details are set once for the whole project.** They're the **same across every checklist** and can't be changed checklist by checklist. **Different projects can have different RFI setups.**

#### What is Re-RFI, and what does On/Off do?

Re-RFI controls what happens after a **Fail or Redo**. It is **ON by default.**

-   **On** — the initiator must raise a **fresh RFI** to restart the inspection.
    
-   **Off** — the process **resumes from the Checklist stage**; **no fresh RFI** is needed.
    

#### What do the Witness and Drawings settings do?

They let you **require a witness** and/or a **drawing** as part of the RFI — enable or disable each as needed.

#### Who sets up RFI?

The **System Admin or Project Admin.**

### 💡 Good to know

-   RFI is enabled **per project:** Settings → RFI → toggle on → **Save → Go live.**
    
-   **Three standard RFI questions** by default; modify or add your own.
    
-   The RFI **questions and details are project-wide** — the **same for every checklist** (can't change per checklist); a **different project can have a different RFI setup.**
    
-   Optionally require **Witness**, **Drawings**, and **Re-RFI.**
    
-   **Re-RFI is ON by default** — **On** = raise a fresh RFI after a Fail/Redo; **Off** = resume from the **Checklist stage** (no fresh RFI).
    
-   After project setup, add RFI to a **checklist stage** — see _2.6.10 How to setup RFI stage in a checklist._
    