# 2.5.13 How to bulk-configure multiple checklists?

Select multiple checklists in a project to act on them together — Assign or Remove Checkers / RFI Initiators / Maker Team / Approver, Configure the stage settings in bulk, and Manage (Go live or Archive). Only the settings you explicitly set are applied.

### Overview

When you **select multiple checklists** in a project, a toolbar lets you act on them **all at once** — **Assign** or **Remove** users/teams, **Configure** the stage settings, and **Manage** (Go live or Archive) — instead of setting up each checklist individually.

### 🧭 How to use

1.  Open the project's **Checklist** tab and **select multiple checklists.**
    
2.  Use the toolbar that appears — **Assign · Remove · Configure · Manage.**
    

**Assign** _(Assign menu)_ — add in bulk:

-   **Assign Checkers** — set the users who fill and submit the checklist for each stage.
    
-   **Assign RFI Initiators** — set the users who raise the RFI to request inspection.
    
-   **Assign Maker Team** — set the team responsible for the physical work on site.
    
-   **Assign Approver** — set the users who approve a checklist stage after inspection.
    

**Remove** _(Remove menu)_ — remove in bulk:

-   **Remove Checkers** — remove the assigned Checkers.
    
-   **Remove RFI Initiators** — remove the assigned RFI Initiators.
    
-   **Remove Maker Team** — remove the assigned maker team.
    
-   **Remove Approver** — remove the assigned approvers.
    

### Configure **— opens** Configure Checklist Stage Settings **for the selected checklists. Set each toggle** On **or** Off:

-   **RFI** — require a request to start inspection.
    
-   **Drawing Required** — require a drawing attachment for each stage.
    
-   **Witness Required** — require witness sign-off for each stage.
    
-   **Allow Skip** — allow stages to be skipped during inspection.
    
-   **Require Validate** — require validation before proceeding to the next stage.
    

_Only the settings you explicitly set to On or Off are applied; unselected settings remain unchanged._ Click **Apply.**

**Manage** — choose:

-   **Go live** — take the selected checklists live.
    
-   **Archive** — archive the selected checklists.
    

**On Go live**, assign the people for the selected checklists:

-   **Checker** _(mandatory)_ — the user who fills and submits the checklist for each stage.
    
-   **RFI Initiator** _(mandatory if an RFI stage is on for any of the selected checklists)_ — the user who raises an RFI to request inspection.
    
-   **Maker Team** _(mandatory)_ — the team responsible for completing the physical work on site.
    
-   **Approver** _(optional)_ — the user who gives checklist stage approval after inspection.
    

Then click **Go live.**

### ❓ FAQ

#### 1\. How do I act on several checklists at once?

In the project's **Checklist** tab, **select multiple checklists** — the **Assign / Remove / Configure / Manage** toolbar appears.

#### 2\. What can I Assign or Remove in bulk?

**Checkers** (fill & submit), **RFI Initiators** (raise the RFI), **Maker Team** (site work), and **Approver** (stage approval).

#### 3\. What settings can I Configure in bulk?

### RFI, Drawing Required, Witness Required, Allow Skip**, and** Require Validate.

#### Will settings I don't touch get changed?

No — **only the settings you explicitly set to On or Off are applied.** Unselected settings remain unchanged.

#### What's under Manage?

**Go live** (take the selected checklists live) and **Archive** (archive them).

#### Which roles are needed on Go live?

### Checker **and** Maker Team **are** mandatory**;** RFI Initiator **is** mandatory if any selected checklist has an RFI stage on**;** Approver **is** optional.

### 💡 Good to know

-   Selecting **multiple checklists** brings up the bulk toolbar — **Assign / Remove / Configure / Manage.**
    
-   **Configure** applies **only the toggles you explicitly set**; the rest are unchanged.
    
-   **Manage → Go live or Archive** the selected checklists.
    
-   On **Go live:** **Checker** and **Maker Team** are mandatory, **RFI Initiator** is mandatory if any selected checklist uses RFI, and **Approver** is optional.
    

### 🔗 Related articles

-   2.6.2 How to add a checklist to a project?
    
-   2.6.3 How to configure or edit a checklist (multiple stages)?
    
-   2.6.4 How to Archive checklist?
    
-   2.2.13 digiQC Inspection Workflows