When RFI is turned on for a checklist stage:
The contractor raises the RFI once the work is ready.
The checker is notified and then carries out the inspection against the checklist.
If an approver is set, the RFI is first reviewed (accepted or rejected) before the inspection begins.
This keeps a clear record of who requested the inspection and when, so work is only checked once it's actually ready.
RFI can run with or without an approver.
On a Fail / Redo / Reject, a new RFI (Re-RFI) can be raised for the same stage.
RFI numbers can be auto-generated (RFI Number Configurator).
2.5.25 RFI Introduction and setup for the Project
2.5.26 Setup RFI stage for Project Checklist
2.5.28 All Inspection workflows with RFI