---
title: "2.5.8 How to add & configure a project (details, radius, time zone)"
description: "System Admin creates a project on a single screen: Project Details, Site Details (radius, time zone, map), and permission toggles. Includes editing later and deactivate/reactivate. Permission meanings are in the companion article."
url: https://help.digiqc.com/en/articles/43-258-how-to-add-and-configure-a-project-details-radius-time-zone
collection: "2.5 Web Setup, Monitoring, Tracking and Analysis"
updated: 2026-11-05
language: en
---

# 2.5.8 How to add & configure a project (details, radius, time zone)

System Admin creates a project on a single screen: Project Details, Site Details (radius, time zone, map), and permission toggles. Includes editing later and deactivate/reactivate. Permission meanings are in the companion article.

### Overview

Only the **System Admin** can create a project. You add and configure it on a **single screen** — **Project Details, Permissions,** and **Site Details** (radius, time zone, location) — all in one place.

A project draws on your **organisation level users, teams and checklists**, and its data is visible **only to that project's users.**

_The permission toggles are set here too — see 2.5.9 for what each one does (some are paid add-ons)._

### 🧭 Add a new project

1.  Go to the **Projects** tab → click **\+ Add.**
    
2.  On the **single screen**, fill in:
    

\- **Project Details** — Name, Unique Code, Client Name, Description _(optional)._ - **Permissions** — set the toggles _(see 2.5.9 Project permissions & add-ons)._ - **Site Details** — **Radius**, **Time zone**, and the **map location** _(Latitude & Longitude)._

1.  Click **Save** to create the project.
    
2.  Then bring in the project's **users, teams and checklists** by **importing your organisation level data** into the project _(see Related articles)._
    

### ✏️ Edit a project later

Go to **Projects** → click the **pencil / edit icon** on the project → change any detail below → **Save.**

### 📋 Project details

-   **Name**
    
-   **Unique Code** — unique to the project _(set at creation; not editable later)._
    
-   **Client Name**
    
-   **Description** — _(optional)._
    

### 📍 Site details

-   **Radius (m)** — the project's **geo-fence radius.** To change it, edit the project, enter the new radius, and **Save.**
    
-   **Time zone** — **all date & time stamps** in the project follow this level. To change it, edit the project → **Site Details** → pick the time zone → **Save.** _(Match it to the project's location.)_
    
-   **Location on the map** — type/search the **address** → drop the **pin** → **Latitude & Longitude** fill in automatically.
    

### 🔐 Permissions

The permission toggles (Location, Authentication, Issue Types, Cost of Quality, RFI, EQC Fail → NCR, RFI Number Configurator) are set on this same screen. **What each one does — including which are paid add-ons — is explained in 2.5.9 Project permissions & add-ons explained.**

### 🛑 Deactivate (or reactivate) a project

Go to the **Projects** tab — each project has a **toggle.** Toggle it **off to deactivate**, and **on to reactivate.**

### ❓ FAQ

### Who can add or configure a project? **Only the** System Admin.

### How do I add a project? Projects → + Add**, then fill the** single screen **— Project Details, Permissions and Site Details — and** Save.

**How do I add users, teams and checklists to the project?** After creating it, **import your organisation level data** into the project _(see Related articles)._

### How do I change the radius or time zone? **Edit the project → update** Radius **or the** Time zone **in** Site Details **→** Save.

**How do I deactivate a project?** Use the **toggle** next to the project on the **Projects** tab _(toggle back on to reactivate)._

### 💡 Good to know

-   **System Admin only.** Add & configure on a **single screen** (Projects → + Add); edit later via the **pencil icon.**
    
-   **Site details:** **Radius** (geo-fence), **Time zone** (drives all timestamps), map **Latitude/Longitude.**
    
-   **Permissions** are set here; what each does is in **2.5.9.**
    
-   **Users, teams and checklists** are brought in by **importing organisation level data** into the project.
    
-   **Deactivate / reactivate** via the toggle on the Projects tab.
    

### 🔗 Related articles

-   2.5.9 Project permissions & add-ons explained
    
-   2.5.3 How to add organisation level users (manually or by CSV import)
    
-   2.5.5 How to add organisation level teams
    
-   2.5.10 How to add a checklist to a project?
