description: "Once RFI is enabled for the project, add it to a checklist stage — RFI is set stage by stage (On for some stages, Off for others). Select the stage, turn on its RFI toggle and Save, optionally set the RFI approver, then Go live and assign the Checker, the RFI Initiator, and the team to notify."
url: https://help.digiqc.com/hi/articles/162-2526-setup-rfi-stage-for-project-checklist
collection: "2.5 Web Setup, Monitoring, Tracking and Analysis"
updated: 2026-11-05
language: hi
alternates: [en]
---

# 2.5.26 Setup RFI stage for Project Checklist

Once RFI is enabled for the project, add it to a checklist stage — RFI is set stage by stage (On for some stages, Off for others). Select the stage, turn on its RFI toggle and Save, optionally set the RFI approver, then Go live and assign the Checker, the RFI Initiator, and the team to notify.

### Overview

Once **RFI is enabled for the project** (see _2.6.9_), you add it to a **checklist stage.** RFI is set **stage by stage** — you can have it **On for one stage and Off for another** in the same checklist. Turn on the stage's **RFI toggle**, optionally set the **RFI approver**, then **Go live** and assign who **raises the RFI.**

### 🧭 How to use

1.  Go to the **Projects** tab → **select the project.**
    
2.  Open the **Checklist** tab → **open the checklist** you want.
    
3.  **Select the stage** where you want RFI → **Settings** tab → turn on the **RFI toggle** → **Save.**
    

\- Do this **per stage** — turn RFI **On** for the stages that need it and leave it **Off** for the others.

1.  _(Optional)_ **Set the RFI approver:**
    

\- Click the **RFI stage** → **Approvers** tab → turn on the toggle. - Select the **approver** — **internal, external, or both.** - **Save.**

1.  Click **Go live** and assign:
    

\- the **Checker** (who fills the checklist), - the **RFI Initiator** (who raises the RFI), - the **Team to notify** about the checklist.

1.  The checklist is now **Live with the RFI process.**
    

### ❓ FAQ

#### 1\. Where do I add RFI to a checklist?

### Projects → the project → Checklist tab → open the checklist → select the stage → Settings → turn on the RFI toggle → Save.

#### Can I have RFI on some stages but not others?

Yes — RFI is set **stage by stage.** Turn it **On** for a particular stage and leave it **Off** for the others in the same checklist.

#### Do I need to set up RFI for the project first?

Yes — **enable RFI for the project** before adding it to a checklist stage (see _2.6.9 RFI Introduction and setup for the Project_).

#### How do I add an approver to the RFI?

Click the **RFI stage → Approvers tab → turn on the toggle → select the approver (internal / external / both) → Save.**

#### Can a stage have RFI without an approver?

Yes — turn on the **RFI toggle**; the **approver is optional.**

#### Who do I assign when going live?

The **Checker**, the **RFI Initiator** (who raises the RFI), and the **Team to notify.**

### 💡 Good to know

-   **RFI must be enabled for the project first** (2.6.9).
    
-   RFI is set **stage by stage** — On for some stages, Off for others.
    
-   The **approver is optional** — internal, external, or both.
    
-   On **Go live**, assign the **Checker**, the **RFI Initiator**, and the **team to notify.**
    