# 2.5.14 How to bulk-assign approvers across checklists?

Checklist tab → select multiple checklists → Assign → Assign Approver: RFI approver (if any), Site/Remote type, Internal/External approvers up to 3 levels. Only current changes are updated.

### Overview

From a project's **Checklist** tab you can **select several checklists** and assign the **same approvers** to all of them in one action — instead of opening each checklist separately.

### 🧭 How to use

1.  Open the **project** → **Checklist** tab.
    
2.  **Select multiple checklists** (tick the ones you want).
    
3.  Click **Assign** → **Assign Approver** — a **side drawer** opens.
    
4.  Set the approvers in the drawer:
    

\- **RFI approver** — shown **only if the checklist's RFI is set with an approver.** If not, the drawer shows **only the inspection-stage approver.** - **Approval type** — **On-site or Remote.** _(If you don't set it, it defaults to Remote.)_ - **Approvers, level-wise** — set the **Internal** and **External** approver for each level, **up to 3 levels.**

1.  **Apply.**
    

### ❓ FAQ

### Why can't I see the RFI approver option?

It appears **only if the checklist's RFI is set with an approver.** If the RFI has no approver, the drawer shows **only the inspection-stage approver.**

### What happens to approvers I already set on other checklists?

They **stay unchanged.** A bulk change updates **only what you set now** — nothing else is touched.

### What is the difference between Site and Remote approval?

**Site** means the approver must be **on site** and approve from the **mobile app.** **Remote** means they can approve from **anywhere** (web or mobile).

### How many approval levels can I set?

Up to **3 levels,** and each level can have an **internal** and an **external** approver.

### Can I still change the approver for one checklist later?

Yes. Open that single checklist and edit its approver the usual way.

### 💡 Good to know

-   **Site vs Remote:** **Site** = the approver must be **on site** and approve from the **mobile app**; **Remote** = approve from **anywhere** (web or mobile).
    
-   **Internal vs External:** set an **internal** (your organisation) and an **external** (e.g. client / PMC) approver for each level.
    
-   The **RFI approver** appears **only** when that checklist's RFI uses an approver.
    

### 🔗 Related articles

-   2.5.13 How to bulk-configure multiple checklists?
    
-   2.5.11 How to configure or edit a checklist (multiple stages)?
    
-   2.5.8 How to add & configure a project (details, radius, time zone & permissions)?