---
title: "2.5.9 Project permissions & add-ons explained"
description: "What each project permission does: Location (geo-fencing), Authentication, Issue Types, Cost of Quality, RFI, EQC Fail to NCR, RFI Number Configurator. Marks the paid add-ons; Location/Authentication need both project and user on."
url: https://help.digiqc.com/hi/articles/275-259-project-permissions-and-add-ons-explained
collection: "2.5 Web Setup, Monitoring, Tracking and Analysis"
updated: 2026-11-05
language: hi
alternates: [en]
---

# 2.5.9 Project permissions & add-ons explained

What each project permission does: Location (geo-fencing), Authentication, Issue Types, Cost of Quality, RFI, EQC Fail to NCR, RFI Number Configurator. Marks the paid add-ons; Location/Authentication need both project and user on.

### Overview

When you add or configure a project you set its **permission toggles.** This article explains **what each one does.** Some are **paid add-ons** (marked). _(To create/configure the project itself, see 2.5.8.)_

Location and Authentication only take effect when they are on for **both the project and the user.**

### 🔐 The permissions

-   **1\. Location** — **geo-fencing.** When on for **both the project and the user**, the user must be **within the project radius** to conduct an inspection.
    
-   **2\. Authentication** — when on for **both the project and the user**, the user must **unlock their phone** to conduct an inspection.
    
-   **3\. Issue Types** _(paid add-on)_ — set **organisation-wide Issue types & sub-types** and use them in the project.
    
-   **4\. Cost of Quality** _(paid add-on)_ — record the **cost of quality of an issue once it's closed.** The **System Admin** adds the cost — **Labour, Material, Machinery** and **Other** — and can also record the issue's **Root Cause** and **Corrective Action.**
    
-   **5\. RFI** — turn **RFI on** for the project; checklists can then use **RFI stages.**
    
-   **6\. EQC Fail → NCR** _(paid add-on)_ — lets a user **raise an NCR-type issue from a checkpoint** during inspection. The **inspection can continue only once that issue is closed.**
    
-   **7\. RFI Number Configurator** _(paid add-on)_ — available when **RFI is on.** It **captures auto RFI numbers**; on a **Fail / Redo / Reject**, a **new RFI (Re-RFI)** is generated for the **same RFI stage.** Configure the numbering to the project's requirement — **set it up before the first RFI is raised.**
    

### ❓ FAQ

**What do Location and Authentication do?** **Location** geofences the project — when on for the project **and** the user, the user must be **within the radius** to inspect. **Authentication** requires the user to **unlock their phone** to inspect.

### Which features are paid add-ons? Issue Types, Cost of Quality, EQC Fail → NCR, **and the** RFI Number Configurator.

**What does Cost of Quality capture?** The **cost of an issue once closed** — **Labour, Material, Machinery, Other** — plus the **Root Cause** and **Corrective Action.** Cost is added by the System Admin.

### What does "EQC Fail → NCR" do? **It lets a Checker** raise an NCR-type issue from a checkpoint**; the** inspection can only continue after that issue is closed.

### What does the RFI Number Configurator do? **With RFI on, it** auto-numbers RFIs**; on a** Fail / Redo / Reject **a** new RFI (Re-RFI) **is generated for the same stage. Set it up** before the first RFI is raised.

### 💡 Good to know

-   **Paid add-ons:** Issue Types, Cost of Quality, EQC Fail → NCR, RFI Number Configurator.
    
-   **Location** and **Authentication** only take effect when on for **both** the project **and** the user.
    
-   **RFI** must be on before a checklist can use RFI stages or the RFI Number Configurator.
    

### 🔗 Related articles

-   2.5.8 How to add & configure a project
    
-   2.5.27 How to set up RFI auto-numbering?
    
-   2.2.18 How to raise an NCR when a checkpoint fails?
