---
title: "2.5.6 How to add an organisation level checklist (from digiQC library or manually)?"
description: "Add an organisation level checklist from the digiQC library or manually; activate to make it an importable organisation library; edit/duplicate/delete/deactivate singly or in bulk."
url: https://help.digiqc.com/hi/articles/42-256-how-to-add-an-organisation-level-checklist-from-digiqc-library-or-manually
collection: "2.5 Web Setup, Monitoring, Tracking and Analysis"
updated: 2026-11-05
language: hi
alternates: [en]
---

# 2.5.6 How to add an organisation level checklist (from digiQC library or manually)?

Add an organisation level checklist from the digiQC library or manually; activate to make it an importable organisation library; edit/duplicate/delete/deactivate singly or in bulk.

### Overview

From the **Setup tab → Checklist**, the **System Admin** adds a checklist in one of two ways — **from the digiQC library** (ready-made templates) or **manually** (a fresh checklist you build yourself).

Checklists live at **organisation level.** Once **Activated**, they become the **organisation library** — available for the **Project Admin or System Admin to import into projects.** **Only activated checklists can be imported.**

### 🧭 How to use

### Add from the digiQC library (ready-made templates)

1.  Open **Setup → Checklist** → click **\+ Add.**
    
2.  Turn on the **"digiQC templates (ready to use)"** toggle.
    
3.  Click **Select Template** → pick **one or more** checklists → **Add.**
    
4.  You'll see **"Checklist added successfully."**
    
5.  **Activate** it — toggle on in the **Actions** column.
    

### Add manually

1.  Open **Setup → Checklist** → click **\+ Add.**
    
2.  Enter the **Checklist name** → select the **UOM** (Unit of Measurement) → **Reference number** _(optional)_ → **Add.**
    
3.  The checklist is created **Inactive and empty** — add its stages & checkpoints by **editing** it _(see 2.7.6)._
    
4.  **Activate** it once its content is ready.
    

### Manage a checklist at organisation level

-   A single checklist can be **edited, duplicated, deleted,** or **deactivated** from the **Actions** column.
    
-   In the **checklist list, select multiple checklists** to **Activate, Deactivate,** or **Delete** them **together** (bulk actions).
    
-   A **deactivated** checklist **can't be imported** into projects.
    

### ⚠️ Activation & re-import — important

-   **Only Activated checklists can be imported** into a project.
    
-   If you **edit a checklist at organisation level after it's already been imported** into a project, the **project's copy does not update automatically** — you must **re-import** the checklist in that project to use the latest version.
    

### ❓ FAQ

#### 1\. What are the two ways to add a checklist?

### Fetch from the digiQC library **(ready-made template) or** create your own manually.

#### What is the "organisation library"?

Your **activated organisation level checklists** — the Project Admin or System Admin can **import** them into any project.

#### Why must I activate a checklist?

Because **only an active checklist can be imported** into a project for inspections.

#### Can I activate or delete several checklists at once?

Yes — in the **checklist list, select multiple checklists** to **Activate, Deactivate,** or **Delete** them together.

#### I edited the checklist but the project still shows the old one — why?

Organisation level edits **don't flow to projects that already imported it.** **Re-import** the checklist in the project to get the latest version.

### 💡 Good to know

-   Add **from the digiQC library** or **manually** (name + UOM, reference optional).
    
-   **Activate** to make it importable — **only active checklists import.**
    
-   A single checklist can be **edited / duplicated / deleted / deactivated;** in the **list, multi-select** checklists to **Activate / Deactivate / Delete** together.
    
-   Organisation level edits **don't auto-update** already-imported project checklists — **re-import** to apply.
    
-   **System Admin** sets these up; **Project Admin & System Admin** can import them into projects.
    

### 🔗 Related articles

-   2.7.6 How to edit an organisation level checklist
    
-   2.7.2 The Setup tab — overview
    
-   2.6.5 How to add a checklist to a project?
    
-   2.6.6 How to configure or edit a checklist (multiple stages)?
