# 1.4 Who can benefit from digiQC & its features

Who benefits from digiQC (owners/RERA, contractors, consultants, solar, infrastructure, govt), the industries and products, its full feature set with examples, and in-depth answers to common 'can digiQC do this?' questions.

### Overview

digiQC is a **digital quality-control platform for construction and infrastructure.** Teams **inspect on the mobile app** and **monitor on the web.** It covers the full quality cycle — **inspections (Inspect), site issues (Issue),** and **record registers (Register)** — with **checklists, photographic proof, approvals, and reporting.**

This article explains **who benefits, the industries it serves, its products, and its full feature set** — with real examples — and answers the common **"can digiQC do this?"** questions.

### 🏗 Who can benefit from digiQC

-   **Project Owners / Developers** — see **real-time quality across all sites** without being on site, get **assurance that work meets spec before releasing payment**, and keep a **complete audit trail** for handover and disputes. For **RERA-regulated** real-estate projects, digiQC provides the **documented, photo-backed quality evidence** that RERA compliance, buyer handovers and possession demand — turning quality from a claim into a verifiable record.
    
-   **General Contractors** — **standardise quality control** across trades and sites, **enforce checklists**, **track sub-contractor performance**, and **cut rework** by catching defects early with evidence.
    
-   **Trade / Sub-contractors (Associates)** — get a **clear checklist of what's expected**, **raise RFIs** when work is ready, **respond to issues** assigned to them, and keep **photo proof** of completed work.
    
-   **Consultants / PMC (Project Management Consultants)** — perform **independent inspection and sign-off**, **approve remotely**, **audit** the work, and **report to the owner** with a defensible record.
    
-   **Solar / renewable-energy organisations** — run **QC for solar EPC**: module-mounting, cabling, earthing and torque checklists across **many distributed sites**, with **geo-tagged photographic evidence** and **remote commissioning approvals.**
    
-   **Infrastructure & EPC companies** — manage quality on **large, multi-site projects** with **standardised checklists, staged inspections and multi-level approvals.**
    
-   **Government bodies / PSUs** _(indirect)_ — their **contractors and consultants use digiQC on government projects**, so the authority gets **standardised quality, photographic evidence and a full audit trail** without any extra effort of its own.
    

### 🏭 Industries served

Building & real estate · roads & highways · **bridges, flyovers & ROBs (road-over-bridges)** · railways & metro · **solar & renewables** · water & utilities · industrial plants · **public buildings — schools & stadiums.**

### 🧩 The products

-   **Inspect** — quality inspections against checklists (**inspection**), with **RFIs** and **multi-level approvals.**
    
-   **Issue** — **raise, assign, respond to and close** site issues (NCRs), including **cost of quality.**
    
-   **Register** — **log-based records** (material tests, pour registers, etc.) with **verification and export.**
    
-   **Web admin** — set up the **organisation library, projects, users, teams** and **reports.**
    

### ✨ Features (with examples)

### Checklists & inspection

-   **Customisable checklists** — Build quality checklists tailored to each activity, with your own stages, checkpoints, answer types and pass/fail rules, so inspections follow your organisation's exact standards rather than a generic template. _Example: create an "RCC Footing Pour Card" with checkpoints such as "Reinforcement diameter & spacing as per drawing", "Clear cover maintained with cover blocks" and "Formwork line, level & rigidity checked" — each set to require a photo, so the steel is documented before the pour is allowed._
    
-   **digiQC template library** — Adopt ready-made, industry-standard checklists and use them as-is or tweak them, so you don't build every checklist from scratch. _Example: pull a standard "Brick Masonry" checklist into your project, add two checkpoints specific to your specification, and activate it in minutes._
    
-   **CSV import** — Create an entire checklist's stages and checkpoints in bulk from a spreadsheet instead of adding points one by one. _Example: an MEP checklist with 80 checkpoints across 5 stages is prepared in Excel and imported in a single upload, ready to inspect._
    
-   **Multi-stage checklists** — Inspect one activity across sequential stages, each with its own checkpoints and approvals, matching how work actually progresses on site. _Example: an RCC element is inspected first at the "Reinforcement" stage (before concrete) and again at the "Pouring" stage, so nothing is buried without a check._
    
-   **Checkpoint types** — Capture each check in the most suitable form: Y/N, Numeric (with values/tolerances), Text, or Option (choose from a list). _Example: "Concrete slump (mm)" is a Numeric checkpoint where the Checker records the measured value, while "Surface finish" is an Option checkpoint (Good / Average / Poor)._
    
-   **Mark-for-QC-fail** — Define exactly which answer fails the stage, so a critical defect automatically flags the inspection instead of relying on the Checker's judgement. _Example: set "Honeycombing observed? = Yes" as the QC-fail answer — the moment Yes is selected, the stage fails and a re-inspection is triggered._
    
-   **Mandatory photo / remark** — Force a photo and/or a written remark on any checkpoint, so no critical check can be signed off without evidence. _Example: the "Reinforcement as per drawing" checkpoint requires a photo — the Checker can't complete the stage until a live picture of the steel is captured._
    
-   **Reference guidance (bulb)** — Attach reference text, links or photos to a checkpoint; the Checker sees a bulb icon and taps it for guidance while inspecting, reducing errors. _Example: on "Clear cover", attach the drawing note "cover = 50 mm ± 5" so the Checker checks against the right tolerance on the spot._
    
-   **Additional points** — Add an ad-hoc checkpoint during an inspection when the site throws up something the checklist didn't cover. _Example: the drawing calls for an extra chamfer not in the checklist, so the Checker adds it as an additional point and photographs it._
    
-   **Nomenclature** — Give every inspection a structured, consistent name/location built from your project's hierarchy, so records are easy to find and report on. _Example: an inspection is named "Tower-A / Floor-3 / Flat-301 / Living-room", making it instantly traceable months later._
    
-   **Offline capture** — Inspect fully offline where there's no signal; data and photos are stored on the device and sync automatically once back online. _Example: a Checker records a full basement inspection with photos in a no-network area, and everything uploads when signal returns._
    

### Photographic proof

-   **Live-camera photos** — Photos can only be taken with the **live camera** (no gallery uploads), so every image is a genuine, current record of the work. _Example: the poured-slab photo must be shot on the spot — an old picture from the gallery can't be attached._
    
-   **Geo-tagged inspections & issues** — Each **inspection and issue is geo-tagged** with its location and time; because only **live-camera** photos are allowed, every photo is inherently captured at that verified place and time. _Example: a dispute over whether Block-C was inspected is settled by the inspection's embedded location and time, backed by its live photos._
    

### RFI & approvals

-   **RFI (Request for Inspection)** — The contractor formally requests an inspection when work is ready, and the inspection proceeds only after that request — mirroring the site RFI process. _Example: once the slab reinforcement is complete, the contractor raises an RFI and the QC engineer is notified to inspect._
    
-   **RFI approver & Re-RFI** — An RFI can require an approver to accept or reject it before inspection, and on a fail a **fresh RFI (Re-RFI)** restarts the cycle after corrections. _Example: the PMC approver rejects an RFI raised prematurely; the contractor rectifies and raises a Re-RFI._
    
-   **Multi-level approvals (L1–L3)** — After a pass, up to three approvers sign off in sequence before the stage completes, matching site hierarchies. _Example: a passed slab inspection goes site-engineer (L1) → project-manager (L2) → client (L3), each approving in turn._
    
-   **On-site & Remote approval** — Choose how an approval is given: **On-site approval** requires the approver to be **on site**, approving from the **mobile app**; **Remote approval** lets them approve from **anywhere, on web or mobile.** Enforce presence where it matters, move fast where it doesn't. _Example: a critical pour uses site approval (the engineer must be present); a routine finish uses remote approval from the office._
    
-   **Auto-pass / approve-with-comment** — A passed inspection **auto-completes** the stage unless an approver deliberately **approves-with-comment**, which keeps it flagged for attention. _Example: routine passes flow through automatically, but an approval with the comment "watch the cold joint" keeps that inspection highlighted._
    
-   **Witness & drawing checks** — Require a witness sign-off or a reference drawing at a stage, enforcing procedures where a third party or drawing must be present. _Example: a stage is set to require the client's witness before it can pass._
    

### Issues (NCR / issues)

-   **Full issue lifecycle** — Raise, assign, respond to, review and close site issues (NCRs), with a clear trail at each step. _Example: cracked plaster is raised, assigned to the contractor, who responds with a repair photo; the raiser's team reviews and closes it._
    
-   **Types & tags** — Classify each issue by type (Quality, Safety, Material, Others) and add tags for area, priority or problem type, so issues can be filtered and analysed. _Example: a fall-hazard is raised as "Safety" and tagged "Zone-B / Priority-High" for quick filtering in reports._
    
-   **EQC Fail → NCR** — Raise a formal NCR (issue) **directly from a failed checkpoint**, linking the defect to the inspection; the inspection continues only once that NCR is closed. _Example: a failed waterproofing check spawns an NCR that must be resolved before the stage proceeds._
    
-   **Cost of Quality** — Record the cost of an issue — **labour, material, machinery and other** — plus its **root cause and corrective action**, quantifying the cost of poor quality. _Example: redoing a defective plaster patch is logged with labour + material cost, root cause "poor mix", corrective action "revised mix approved"._
    

### Register

-   **Log-based records** — Maintain structured registers for repetitive records that aren't checklist inspections. _Example: a cube-test register logs each sample's ID, casting date, testing date and 28-day strength._
    
-   **Computations & multi-level verification** — Registers can **auto-calculate** values and send logs to **up to three levels of verifiers**, then **export** to a report. \_Example: a pour register computes total concrete volume and is verified by the engineer before export.\_
    

### Control, access & security

-   **Geo-fencing (radius)** — Inspections can be restricted to within the project's set radius, so they can only be done at the actual site. _Example: with a 200 m radius, a Checker standing off-site can't start or submit an inspection._
    
-   **Device authentication** — Require a phone unlock (biometric / PIN) before an inspection, tying the record to the authenticated device holder. _Example: the Checker must pass Face ID before each inspection._
    
-   **Role-based access** — Assign roles (System Admin, Project Admin, Inspector, Approver, Auditor, Associate) with **rights per project**, so each person only sees and does what their role allows. _Example: an Auditor can review and comment but not conduct inspections._
    
-   **Organisation library** — Users, teams and checklists live at organisation level and are **imported into any project**, so setup is fast and consistent. _Example: a standard "Finishing works" checklist is imported unchanged into every new tower project._
    
-   **Multi-project / multi-org** — One user account works across many projects and even **multiple organisations** that use digiQC. _Example: a consultant inspects on three different developers' projects with one login._
    
-   **Time-zone stamping** — All date/time stamps follow the **project's time zone**, keeping records accurate across regions. _Example: a project in another time zone shows inspection times in local time._
    
-   **Secure cloud storage & audit trail** — Data and photos are stored securely in the cloud with a **full record of who did what and when**. _Example: months later, you can see exactly who approved a stage and at what time._
    

### Tracking & reporting

-   **Target vs Achieved** — Set a **weekly inspection target** per project and track the actual final-passes against it in real time. _Example: a target of 20 final-pass inspections this week updates live as the site completes them, with a CSV of the week's inspections._
    
-   **Analytical reports & dashboards** — Get quality insights and trends **across projects** for leadership monitoring. _Example: a dashboard shows pass rates and open NCRs by project._
    
-   **Inspection & issue reports** — Download **CSV logs** and **PDF reports**, or send a **QC-report link on email**, filtered by date range. _Example: export a month's EQC log to CSV, or email the final QC-report links to the client._
    
-   **Report configurator** — Customise **what the inspection PDF report contains and how it looks.** _Example: add the organisation logo and choose which fields print on the client report._
    
-   **Searchable history** — Find any past inspection or issue quickly. _Example: search all "waterproofing" inspections in Tower-B last quarter._
    
-   **Instant notifications** — **WhatsApp + in-app** notifications keep everyone updated on assignments, responses and approvals. _Example: an assigned contractor gets a WhatsApp the moment an issue is raised to them._
    
-   **Identify training needs** — Recurring failures surface where teams need training. _Example: repeated failures on "cover blocks" flag a toolbox-talk need._
    

### 🤖 Can digiQC do…? (in depth)

### Can I enforce photo evidence on a check?

Yes. Every checkpoint has an **"EQC Photo Required"** (and **"Remarks Required"**) setting. When it's on, the Checker **cannot complete that checkpoint or the stage without a live, camera-only photo**, which is geo-tagged and time-stamped. _How to set it up:_ open the project's checklist → edit the checkpoint → turn on **EQC Photo Required** (and Remarks Required if a note is also needed). Every future inspection of that stage then carries the photo as mandatory evidence.

### Can we work without internet on remote sites?

Yes. digiQC supports **offline inspection**. Before going to a low-network area, the user opens the project once while online to cache its data; they can then inspect and capture photos fully offline, and everything **syncs automatically** when connectivity returns. Note that new server-side changes won't show until back online, and a next stage that needs approval must sync first. _How to set it up:_ open the project online to cache it, work offline, then let it sync (or use Sync).

### Can approvals happen without being on site?

Yes. **Remote approval** lets an approver review the inspection (answers, photos, remarks) and **Approve** or **Redo** from **web or mobile, wherever they are.** Up to **three approval levels (L1–L3)** can be configured per stage, and RFIs can have their own approver too. _How to set it up:_ set the number of approval levels on the checklist stage and assign approvers; they act from their **To Do** list.

### Can we require an approver to be physically on site to approve?

Yes. Approval can be set to **On-site approval**, where the approver **must be on site** and approve **from the mobile app** — used for critical activities where presence matters. (The alternative is **Remote approval**, from anywhere on web/mobile.) _How to set it up:_ choose the approval type (Site vs Remote) for the stage/approver.

### Can we build the workflow to match our organisation's process?

Yes. Inspection **workflows are configurable** — turn RFI on/off, add an RFI approver, set **0–3 approval levels (L1–L3)**, enable **Re-RFI**, and require **witness/drawing** — so the checklist follows **your organisation's exact approval process.** _How to set it up:_ configure RFI and approval levels on the checklist stage (see the RFI & workflow articles).

### Can each checklist stage have a different workflow?

Yes. Workflow settings are **per stage**, so different stages of the same checklist can follow **different flows.** _Example: the reinforcement stage requires L1–L3 approval, while a minor stage just needs a pass._ _How to set it up:_ configure each stage independently.

### Can we have multiple workflows in one project?

Yes. A project can run **many workflows at once** — different checklists and stages can each have their own RFI/approval configuration, and add-ons (RFI, EQC Fail → NCR, etc.) are set per project. _How to set it up:_ configure per checklist/stage; enable add-ons in project permissions.

### Can we track the cost of poor quality?

Yes. The **Cost of Quality** feature records, when an issue is closed, the cost incurred — **labour, material, machinery and other** — plus the **root cause** and **corrective action**. _How to set it up:_ enable **Cost of Quality** (a paid add-on); the System Admin adds the cost when the issue is closed.

### Is bulk adding and editing possible?

Yes. You can **bulk-import** users, teams and checklists via CSV, **bulk-add checkpoints** to a stage, **bulk-configure multiple checklists** at once, and **multi-select checkpoints** to edit or delete together. _How to set it up:_ use the **Import / Bulk Add / bulk-configure** options in the Setup tab and checklist editor.

### Can I maintain test reports in digiQC?

Yes — through **Register**. Create a register (e.g. a **cube-test** or **material-test** register) that logs each entry, **auto-computes** values, is **sent for verification**, and **exports** as a report. **How to set it up:** create the register for the test in **Register**.

### Can I generate a report in a single click?

Yes. From the **Reports tab** you can **download** a CSV log or **PDF report**, or **email a QC-report link**, in one click after choosing your filter and date range. _How to set it up:_ Reports tab → set filter/date range → download or email.

### Can I download logs of inspections, issues and register in CSV?

Yes. **Inspect** gives **EQC Log, Latest Log and Count** CSVs; **Issue** gives **Issue Detailed and Latest Log**; **Register** exports its records in **Excel and PDF** — all by date range. **How to set it up:** use the **Reports tab** (Inspect/Issue) and **Register export**.

### Can I get reports for audit or the client?

Yes. **CSV logs, configurable PDF inspection reports** (with your logo, via the **Report Configurator**), and a **QC-report link on email** provide a defensible record for audits and clients. _How to set it up:_ Reports tab + Report Configurator.

### Can I request a customised dashboard?

Yes. Beyond the standard analytics, digiQC offers **customised dashboards on request** — e.g. a leadership quality dashboard tailored to your organisation's hierarchy and reporting needs. _How to set it up:_ request a custom dashboard from the digiQC team.

### Can I set a project's location and analyse by it?

Yes. Set the project's **location and radius** on the map (geo-fencing), and use **nomenclature levels** so every inspection is tied to a structured location — enabling **location-wise analysis** in reports and dashboards. _How to set it up:_ set the radius on the project and configure nomenclature levels.

### Can we edit or delete an inspection/issue after it's time-stamped?

**No — and that's by design.** Every **inspection, issue and register entry is authenticated, time-stamped and immutable** — once submitted it **cannot be edited or deleted.** This guarantees a **tamper-proof, audit-grade** record. (You can add further stages, responses or comments, but the recorded entry itself never changes.)

### Is access controlled per user?

Yes. digiQC is **role-based** — each user has a role (System Admin, Project Admin, Inspector, Approver, Auditor, Associate) and **per-project rights** (location, authentication, web access, Raise, and which checklists/RFIs they can operate). _How to set it up:_ set the role and rights in the project's **User** tab.

### Can we scope a user's access to only their team or the whole project?

Yes. A user's **Web Access** can be set to **Team** (they see only their team's data) or **Project** (they see the whole project), and they can be assigned **specific checklists and RFIs** — so people get exactly the data access you intend. _How to set it up:_ set **Web Access (Team/Project)** and assign checklists/RFIs in the project's **User** tab.

### Can we stop inspections being faked from a different location?

Yes — through three controls used together. **Geo-fencing** restricts inspections to within the project radius; **real-time camera-only** photos (no gallery) are each geo-tagged and time-stamped; and **device authentication** can force a biometric unlock before inspecting. Together these ensure the inspection was done **at the site, at the time, by the right person.** _How to set it up:_ enable **Location** and **Authentication** in the project's permissions and set the radius on the map.

### Can a contractor request an inspection (RFI)?

Yes. With **RFI** enabled on a checklist stage, the RFI Initiator **raises a Request for Inspection** when work is ready; the checker is notified and inspects only after that request. An **RFI approver** and **Re-RFI** (a fresh RFI after a fail) can also be configured. _How to set it up:_ turn on RFI for the project, then enable it on the relevant checklist stage.

### Can we track the cost of poor quality?

Yes. The **Cost of Quality** feature records, when an issue is closed, the cost incurred — **labour, material, machinery and other** — plus the **root cause** and **corrective action**. This quantifies rework cost and supports analysis. _How to set it up:_ enable **Cost of Quality** (a paid add-on) on the project; the System Admin adds the cost details when the issue is closed.

### Can we reuse checklists across projects?

Yes. Checklists are created once at **organisation level** (the organisation library) and **imported into any project**, so every project starts from the same standard. Editing a library checklist doesn't change already-imported project copies — you **re-import** to update. _How to set it up:_ create and **activate** the checklist in the **Setup** tab; inside a project, use **Import** to pull it in.

### Can we get reports for audit or the client?

Yes. digiQC produces **CSV logs** (EQC log, latest log, count), **PDF inspection reports**, and can **email a QC-report download link** filtered by date range; **issue reports** (detailed and latest) are available too. The PDF is customisable via the **Report Configurator** and carries your organisation logo. _How to set it up:_ use the **Reports tab** (filter + date range) to download or email; configure the PDF via the **Report Configurator**.

### Can different people have different access?

Yes. **Role-based access** gives each user a role (System Admin, Project Admin, Inspector, Approver, Auditor, Associate) and **per-project rights** — location, authentication, web access, Raise, and which checklists/RFIs they can operate. _How to set it up:_ set the user's role and rights in the project's **User** tab.

### Can we set and track quality targets?

Yes. **Target vs Achieved** lets a project admin set a **weekly target** of expected final-pass inspections and see the **achieved count update in real time**, with a CSV of the week's inspections. _How to set it up:_ open the project's **Target** tab and set the week's target.

### Can we structure and trace inspections / Issues / Register by location?

Yes. **Nomenclature** builds a structured name for each inspection from your project hierarchy (e.g. tower / floor / flat / room), making records consistent and easy to find and report. _How to set it up:_ configure the nomenclature **levels** at project level; Checkers pick the location when starting an inspection.

### Can we raise a non-conformance from a failed check?

Yes. With **EQC Fail → NCR** enabled, a **failed checkpoint** can directly raise an **NCR (issue)**; the inspection can continue only once that NCR is **closed**, tying defects to corrective action. _How to set it up:_ enable the **EQC Fail → NCR** add-on on the project.

### 💰 Benefits / ROI

-   **Less rework** — defects caught early, with evidence.
    
-   **Faster approvals** — remote and multi-level.
    
-   **Fewer disputes** — photo proof and a full audit trail.
    
-   **Standardised quality** — across sites and teams.
    
-   **Greater accountability & visibility** — for owners, consultants and contractors alike.
    

### 💡 Good to know

-   digiQC covers the full quality cycle — **Inspect, Issue, Register** — on **mobile + web.**
    
-   It benefits **owners/developers (incl. RERA), contractors, consultants, solar and infrastructure/EPC firms**, and — indirectly — **government/PSU** projects through their contractors & consultants.
    
-   Core strengths: **evidence-based inspections, RFIs & multi-level approvals, issue tracking with cost of quality, offline capture, geo-fencing, and rich reporting.**
    
-   Records are **authenticated, time-stamped and immutable** — inspections/issues **can't be edited or deleted**, giving an audit-grade trail.
    