Answer — RFI (Request For Inspection) is how the contractor asks for an inspection when work is ready. Re-RFI is raising a fresh RFI after a fail or redo.
RFI — the maker requests inspection; the checker inspects after.
Re-RFI — after a Fail or Redo, a new RFI is raised to restart the inspection.