System Admin creates a project on a single screen: Project Details, Site Details (radius, time zone, map), and permission toggles. Includes editing later and deactivate/reactivate. Permission meanings are in the companion article.

Overview

Only the System Admin can create a project. You add and configure it on a single screen — Project Details, Permissions, and Site Details (radius, time zone, location) — all in one place.

A project draws on your organisation-level users, teams and checklists, and its data is visible only to that project's users.

The permission toggles are set here too — see 2.5.9 for what each one does (some are paid add-ons).

🧭 Add a new project

  1. Go to the Projects tab → click + Add.

  2. On the single screen, fill in:

- Project Details — Name, Unique Code, Client Name, Description (optional). - Permissions — set the toggles (see 2.5.9 Project permissions & add-ons). - Site Details — Radius, Time zone, and the map location (Latitude & Longitude).

  1. Click Save to create the project.

  2. Then bring in the project's users, teams and checklists by importing your organisation-level data into the project (see Related articles).

✏️ Edit a project later

Go to Projects → click the pencil / edit icon on the project → change any detail below → Save.

📋 Project details

  • Name

  • Unique Code — unique to the project (set at creation; not editable later).

  • Client Name

  • Description — (optional).

📍 Site details

  • Radius (m) — the project's geofence radius. To change it, edit the project, enter the new radius, and Save.

  • Time zone — all date & time stamps in the project follow this zone. To change it, edit the project → Site Details → pick the time zone → Save. (Match it to the project's location.)

  • Location on the map — type/search the address → drop the pin → Latitude & Longitude fill in automatically.

🔐 Permissions

The permission toggles (Location, Authentication, Instruction Types, Cost of Quality, RFI, EQC Fail → NCR, RFI Number Configurator) are set on this same screen. What each one does — including which are paid add-ons — is explained in 2.5.9 Project permissions & add-ons explained.

🛑 Deactivate (or reactivate) a project

Go to the Projects tab — each project has a toggle. Toggle it off to deactivate, and on to reactivate.

❓ FAQ

Who can add or configure a project? Only the System Admin.

How do I add a project? Projects → + Add, then fill the single screen — Project Details, Permissions and Site Details — and Save.

How do I add users, teams and checklists to the project? After creating it, import your organisation-level data into the project (see Related articles).

How do I change the radius or time zone? Edit the project → update Radius or the Time zone in Site Details → Save.

How do I deactivate a project? Use the toggle next to the project on the Projects tab (toggle back on to reactivate).

💡 Good to know

  • System Admin only. Add & configure on a single screen (Projects → + Add); edit later via the pencil icon.

  • Site details: Radius (geofence), Time zone (drives all timestamps), map Latitude/Longitude.

  • Permissions are set here; what each does is in 2.5.9.

  • Users, teams and checklists are brought in by importing organisation-level data into the project.

  • Deactivate / reactivate via the toggle on the Projects tab.

🔗 Related articles

  • 2.5.9 Project permissions & add-ons explained

  • 2.5.3 How to add organisation-level users (manually or by CSV import)

  • 2.5.5 How to add organisation-level teams

  • 2.5.10 How to add a checklist to a project?

Did this answer your question?
😞
😐
😁