2.2.1 How to start an inspection?
2.2.2 How to add an additional point to the checklist?
2.2.3 How does Sync feature works?
2.2.4 How to start the next stage of the same inspection?
2.2.5 Inspection list explanation - Available, Paused & Approval
2.2.6 How does a stage pass after the approver approves?
2.2.7 RFI process and inspection
2.2.8 RFI process without Approver
2.2.9 RFI process with Approver
2.2.10 Choosing a location: levels, your own name, or both
2.2.11 How to download inspection reports from the web app (Reports tab)?
2.2.12 How to discard an inspection in Paused tab?
2.2.13 digiQC Inspection Workflows
2.2.14 Re-inspect fail checklist
2.2.15 Re-inspect redo checklist
2.2.16 How to do next stage in offline mode from Sync?
2.2.17 How to review pending approvals (mobile & web app)
2.2.18 How to raise an NCR when a checkpoint fails?
2.2.19 How does team-scoped visibility work on mobile?
2.2.20 How a location reads on a record