2.2.1 How to start a new Inspection/EQC?
2.2.2 How to add an additional point to the checklist?
2.2.3 How does Sync feature works?
2.2.4 How to start the next stage of the same EQC?
2.2.5 EQC list explanation - Available, Paused & Approval
2.2.6 How to "PASS" the Approved EQC to complete the stage?
2.2.7 RFI process and inspection
2.2.8 RFI process without Approver
2.2.9 RFI process with Approver
2.2.10 How inspector can utilize Nomenclature in Mob app?
2.2.11 How to download EQC reports from the web app (Report tab)?
2.2.12 How to discard EQC in Paused tab?
2.2.13 digiQC Inspection Workflows
2.2.14 Re-inspect fail checklist
2.2.15 Re-inspect redo checklist
2.2.16 How to do next stage in offline mode from sync tab?
2.2.17 How to review pending approvals (mobile & web app)
2.2.18 How to raise an NCR when a checkpoint fails?