2.2.1 How to start a new Inspection/EQC?
2.2.2 How to add an additional point to the checklist?
2.2.3 How does Sync feature works?
2.2.4 How to start the next stage of the same EQC?
2.2.5 EQC list explanation - Available, Paused & Approval
2.2.6 How to "PASS" the Approved EQC to complete the stage?
2.2.7 How will Inspector/QC Engineer start Inspection after RFI
2.2.8 RFI process without Approver
2.2.9 RFI process with Approver
2.2.10 How inspector can utilize Nomenclature in Mob app?
2.2.11 How to download EQC reports from web app?
2.2.12 How to discard EQC in Paused tab?
2.2.13 digiQC Inspection Worklows
2.2.14 Re-inspect fail checklist
2.2.15 Re-inspect redo checklist
2.2.16 How to do next stage in offline mode from sync tab?